congratulations EVERYONE for completing Career Disco!
best wishes for whatever is next!
Saturday, July 24, 2010
Monday, July 19, 2010
Project 4 Site Analysis
1. History (Tim, Melina, Erin)
2. Topography (John N., Aida, Tara)
3. Neighborhood Character (Parker, Rae, Kelvin)
4. Circulation (Hubbard, John, Sandy)
5. Program + Use(John F., Maggie, Ivy)
6. Buildings + Open Space B+O Part Two (Margo, Lisa, Kelsy, Michelle)
7. Vegetation (Alyssa, Laura, Carly, Ashley)
8. Materials (Kevin, Maria, Neale)
9. Hydrology (Cara, John S, John C)
10. Climate (Jared, Kristen, Mallie)
11. Site Conditions (Abraham, Zack, David)
12. Precedents (Jessie, Sopia, Janna)
2. Topography (John N., Aida, Tara)
3. Neighborhood Character (Parker, Rae, Kelvin)
4. Circulation (Hubbard, John, Sandy)
5. Program + Use(John F., Maggie, Ivy)
6. Buildings + Open Space B+O Part Two (Margo, Lisa, Kelsy, Michelle)
7. Vegetation (Alyssa, Laura, Carly, Ashley)
8. Materials (Kevin, Maria, Neale)
9. Hydrology (Cara, John S, John C)
10. Climate (Jared, Kristen, Mallie)
11. Site Conditions (Abraham, Zack, David)
12. Precedents (Jessie, Sopia, Janna)
Sunday, July 11, 2010
landscape tool kit examples

The Highline Competition Entry
(Field Operations)
Click on image for larger view

Thickening the Surface
(Chris Reed, StossLU)

Villages in Development in the Pearl River Delta
(GSD seminar: Gena Wirth, Nilay Mistry, Andrew Watkins, Dorothy Tang)
Borneo Sporenburg (West 8)
Hafencity (Kees Christaanse)
(GSD Studio: Danielle Meyer, Ken Suzuki, Chis Sherwin, Dorothy Tang)
Saturday, July 10, 2010
LA 3 Schedule, Supplemental Assignments & Deliverables
Here is a detailed schedule for the week of July 12th. I will send another one later!
I am also giving supplemental assignments for our section to keep us in design mode. This document also outlines the final project requirements.
I am also giving supplemental assignments for our section to keep us in design mode. This document also outlines the final project requirements.
Wednesday, July 7, 2010
project 3 analysis
here is a link to all of the project 3 analysis files
https://www.yousendit.com/download/K0JUaUNGUnJiR0kwTVE9PQ
https://www.yousendit.com/download/K0JUaUNGUnJiR0kwTVE9PQ
REVISION of scale for case study
Instead of 1"=5000'-0" for the scale comparison, we are now doing 1"=200'-0"
Here is the updated brief.
Here is the updated brief.
Important Announcements for LA3
(1) Case Studies: I would like to meet with you for 10 minutes between now and Friday morning to review your progress on your case study assignment. I will be available Wednesday 9:30-11am (yes, now!) 6-9pm, Thursday 6-9pm, and Friday 9am-12pm. This is mandatory, but you must approach me.
(2) Arch & LA Pinup on Friday: Sevak has invited us to join Arch 6 (3rd Floor Lounge) this friday from 10-12 to see how they have approached site analysis. I would also like YOU to pin up the work you have done for this session. Location will be announced later. THIS IS IN ADDITION TO THE FORMAL LANDSCAPE REVIEW ON FRIDAY AFTERNOON.
(3) This Sunday from 4-8pm: MODEL BUILDING! Please come at 4, dinner will be served, but we def. need your help to build a context model for our section.
Don't forget that I (Dorothy) will be available as a resource for you even if I won't be working directly with you this week.
(2) Arch & LA Pinup on Friday: Sevak has invited us to join Arch 6 (3rd Floor Lounge) this friday from 10-12 to see how they have approached site analysis. I would also like YOU to pin up the work you have done for this session. Location will be announced later. THIS IS IN ADDITION TO THE FORMAL LANDSCAPE REVIEW ON FRIDAY AFTERNOON.
(3) This Sunday from 4-8pm: MODEL BUILDING! Please come at 4, dinner will be served, but we def. need your help to build a context model for our section.
Don't forget that I (Dorothy) will be available as a resource for you even if I won't be working directly with you this week.
Tuesday, July 6, 2010
Project 4 Launch-City Hall Plaza
Despite the 90 degree weather, this should be a fun project.
Project Statement
Working Schedule (Also check out the calendar link above for updated info)
Project Launch Presentation
Base Maps
1"=40'-0" Scale Base Map (36"x36")
1"=2000'-0" Scale Context Map (11"x17")
1"=2000'-0" Scale Context Map without Site Boundaries (11x17)
If all fails, try this link
Project Statement
Working Schedule (Also check out the calendar link above for updated info)
Project Launch Presentation
Base Maps
1"=40'-0" Scale Base Map (36"x36")
1"=2000'-0" Scale Context Map (11"x17")
1"=2000'-0" Scale Context Map without Site Boundaries (11x17)
If all fails, try this link
Monday, July 5, 2010
Back Bay Fens field trip
If you are interested in more information about the Back Bay Fens, see the following links:
Kathy Poole (University of Virginia)
The Emerald Necklace Conservancy
Kathy Poole (University of Virginia)
The Emerald Necklace Conservancy
Subscribe to:
Posts (Atom)

